Matching a hydraulic pump shaft, flange and ports requires evidence from both the proposed pump and the equipment it will connect to. Compare the complete configuration code and interface drawings with the actual coupling hub, bellhousing, mounting features and hydraulic connections. Resolve differences and unknowns against identifiable evidence before approving the configuration.

This guide focuses on replacement piston pumps and OEM installations where existing drive components or pipework may be retained. It provides an interface comparison method; pressure, displacement, control function and other operating requirements still need their own review.

Start with the Complete Pump Code and Mating Components

Build the comparison around three records: the installed pump, the proposed replacement and the equipment-side components. A pump photograph alone leaves the coupling bore, available axial space and mounting fit unresolved.

Keep the full nameplate code, including suffixes, with a photograph. Add the candidate's proposed supply code and its drawing number, revision and units. For help interpreting identification fields, first identify the complete pump code.

Then identify the components that will remain: motor or gearbox, bellhousing, coupling hub, any rear-mounted pump, and the existing adapters and pipe connections. Request their drawings or part references as well. These are the other half of the interface comparison.

Resolve Conflicts Between the Nameplate and Hardware

If the nameplate suggests one option but the visible hardware suggests another, record the conflict. Repair history, replacement parts or an incomplete code may need investigation; none should be assumed without evidence.

Keep field measurements separate from nominal drawing dimensions and tolerances. Measurements can help identify a likely interface, but a reading from a worn surface does not establish its original fit. Ask the responsible supplier or equipment engineer to resolve the discrepancy against identifiable documents.

Define What Each Interface Standard Covers

An interface standard must be attached to a specific feature. "SAE" on a quotation is too broad to establish the shaft, mounting flange, hydraulic port and fasteners together.

SAE J744_202110 addresses mounting and drive dimensions for hydraulic pumps and motors used on off-road self-propelled work machines as described in SAE J1116. Confirm whether that standard applies to the equipment under review; its scope does not automatically cover every industrial installation. ISO 3019-2:2001 addresses mounting flanges and shaft ends in a metric series. These public records establish scope, while the applicable drawings and standard details are still needed to confirm a particular interface. (SAE International; ISO)

Technical engineering schematic separating hydraulic pump mounting flange pilot and drive shaft geometry under SAE J744 and ISO 3019-2 from four-screw ISO 6162-1 hydraulic port flanges and threaded ports

Separate Mounting Flanges from Hydraulic Port Flanges

The mounting flange connects the pump mechanically to its support. A hydraulic port flange connects a fluid passage to pipework or a hose assembly. Give them separate entries in the specification.

Interface Record on the comparison Evidence to obtain
Pump mounting Complete flange designation, pilot and mounting-face geometry, hole arrangement Pump and bellhousing or equipment mounting drawings
Shaft and hub Full shaft designation, fit, usable geometry and axial position Shaft drawing and mating-hub drawing
Hydraulic port flange Connection standard, series, size, sealing features and fastening details Port drawing and matching connector specification
Threaded port Full thread designation and sealing arrangement Pump port definition and fitting documentation

ISO 6162-1:2012 covers four-screw hydraulic connections using split or one-piece flange clamps, including the associated connectors, ports and mounting surfaces. Its published scope spans DN 13 to DN 127 and 3.5–35 MPa (35–350 bar), with metric or inch screws. These ranges describe the standard's coverage; they do not assign every size or component a 350 bar rating. Confirm the selected connection's rating, sealing details and actual fastener thread. The public abstract is used here for scope, without reproducing the standard's dimension tables. (ISO)

At the time of this review in November 2026, ISO lists ISO 6162-1:2012 as the published edition, last reviewed and confirmed in 2023. ISO/DIS 6162-1 is a Draft International Standard under development and is intended to replace the 2012 edition; it is not yet the published replacement. Verify the applicable edition when freezing a new design or specification.

Compare the Shaft with the Coupling or Drive Hub

Check the shaft and its mating component together. Record where each dimension starts, which surfaces transmit torque and which features locate or retain the hub.

Record Keyed, Splined or Tapered Shaft Details

Use fields appropriate to the actual shaft form:

Shaft form Information to obtain from the applicable drawings
Keyed Shaft diameter and tolerance, key and keyway dimensions, usable length, shoulder and retention details
Splined Standard and complete designation, tooth count, pitch or module, pressure angle, fit, usable spline length and relevant clearances
Tapered Taper definition, reference diameters and positions, key details where used, seating and retention arrangement

Engineering diagram comparing keyed shaft, tapered shaft, and splined hydraulic pump drive shaft engagement depth and axial clearance inside a mating coupling hub and bellhousing reference

Tooth count alone is insufficient: Danfoss's April 2021 LPV document defines input-shaft option A with 13 teeth, 16/32 pitch, a 30° pressure angle and fit information. This example applies to that LPV option. (Danfoss, printed page 26)

For the comparison record, copy the complete designation or reference the controlled drawing. Keep tooth counts and diameter measurements as supporting observations until the mating specification is established.

Check Engagement and Axial Clearance

Compare shaft projection and hub position from consistent mounting references. Identify the usable engagement region, hub bore depth, shoulders, retention features and any specified clearance after assembly. Shaft projection alone does not state the assembled engagement.

Use the pump, coupling and bellhousing requirements to establish acceptable values. There is no universal clearance or engagement length supplied by this guide.

The LPV document's 11-tooth auxiliary-pad option requires a special short mating-pump shaft because clearance to the LPV shaft is reduced. This option-specific restriction illustrates why an auxiliary-interface label still needs an axial check. (Danfoss, printed page 28)

Check the Mounting Pilot, Face and Bolt Arrangement

Compare the locating pilot with the mating bore, then check the mounting faces and fasteners. Record pilot diameter and length, mating-bore dimensions and depth, specified tolerances, mounting-face geometry and the complete hole arrangement.

For each mounting hole, distinguish clearance holes from tapped holes and record the applicable diameter or thread. Describe positions using the drawing's coordinate dimensions, centre distances or bolt-circle definition. A hole count by itself leaves the arrangement unresolved.

Include the Bellhousing and Assembly Requirements

Include the bellhousing drawing and instructions in the evidence set. KTR's bellhousing instructions address centering engagement, designated threaded holes and screw selection separately. They also require securing the drive against accidental startup during assembly work. These are instructions for the covered KTR components, not universal dimensions or tightening values. (KTR, 41010 EN, edition 8, July 2019)

For a proposed installation, obtain the specified screw length, engagement, grade and tightening requirements for the actual components. If the mounting faces will not seat as required, identify the interference before proceeding. A bolt arrangement that looks similar cannot resolve a pilot, shoulder or coupling interference.

Identify Every Pump Port and Its Seal

Assign each port a function using the applicable pump drawing and circuit information. List the main connections and any case-drain, charge, control or measurement connections fitted to that configuration. Preserve the manufacturer's port labels, but record their stated functions as well.

The April 2021 Danfoss LPV installation drawing labels its case-drain and charge-inlet connections as SAE straight-thread O-ring boss (ORB). For these LPV connections, verify the stated function, complete thread designation and O-ring sealing requirements together. This example does not define other pump series. (Danfoss, printed page 29)

Separate the Body Port, Adapter and Hose End

Create separate entries for the pump-body port, installed adapter and hose or tube end. If an adapter hides the body connection, mark the body-port specification as unknown until documentation or an appropriate inspection establishes it. The visible hose end cannot identify the hidden pump-body port.

Use the following fields for each connection:

Field What to record
Identity Port label, function and photograph or drawing location
Body connection Standard, full size designation, thread form or flange details
Adapter Part reference and connection definition at each end
Seal Seal location, specified sealing element and applicable material requirements
Pipework Hose or tube end, orientation and installed routing
Conditions Applicable pressure, temperature and fluid requirements from the selected component documents

 Exploded technical assembly diagram separating hydraulic pump-body port cavity, O-ring boss and bonded seal washer, conversion adapter fitting, and hydraulic hose end connection for SAE ORB, BSPP, and NPT identification

Thread pitch alone cannot establish compatibility. Parker's October 2025 Catalog 4260, published by its Instrumentation Products Division for instrument pipe and ISO conversion fittings, lists nominal 1/2 NPT, BSPP and BSPT at 14 threads per inch, with thread-form angles of 60° for NPT and 55° for BSP. It is used here for thread identification, rather than as a complete hydraulic-pump port standard or permission to interchange connections. (Parker, printed page 26)

Confirm the Connection and Fastener System

Check the seal as well as the thread or flange designation. Parker documents several BSPP sealing arrangements. Its illustrated NPT/BSPP conversion fittings require a bonded seal at the specified BSPP end, and the stated BSPP-end rating depends on the sealing washer. That requirement is product-specific; "BSPP" does not specify every sealing detail. (Parker, Catalog 4260, printed pages 27–29; Parker conversion fittings)

For flanged connections, record the actual port geometry, sealing parts, clamp or connector and screw specification. Use documentation or suitable identification methods to resolve uncertainty before assembly. Do not use trial tightening as evidence of connection compatibility.

Review Through Drives, Support and Installation Space

A rear-mounted pump adds another interface and another set of assembly requirements. Include its mounting, shaft connection, sealing, transmitted load and available space in the comparison.

For LPV, Danfoss treats external shaft and mounting-flange loads separately and requires combined main-pump and auxiliary-pump torque to remain within the input-shaft rating. Another candidate needs its own limits. (Danfoss, printed pages 10–13 and 28)

For the project record, request drive-load information and assembly-support information separately. Include the installed pump group, support arrangement and equipment-side constraints. Review the envelope with the actual control block, adapters and attached pump shown, including access needed for connections and service.

Treat Adapters as Changes to the Assembly

When an adapter is proposed, record what changes and who must approve it. A mounting adapter requires a revised axial layout; a different coupling requires the shaft and hub comparison to be repeated; a port adapter requires its sealing, operating suitability and installed space to be checked.

Separate two project paths. If existing mating components will be retained, resolve the interfaces against those components. If the project permits a revised bellhousing, coupling or pipework, define the replacement assembly and its approval responsibilities before confirming the pump order.

Carry the operating information into the same project package. The guide to preparing the full pump specification covers the wider inputs needed alongside the interface review.

Record Interface Evidence and Resolve Differences

Use a comparison record that identifies the evidence behind each conclusion. The template below is an editorial working tool, not an ISO or SAE inspection form. Expand the port row for every connection on the actual configuration.

Field group Installed pump or equipment-side evidence Proposed configuration evidence Difference, owner and confirmation
Identity Full code, nameplate photo, known modification history Supply code, drawing number and revision Record conflicts and the party responsible for resolving them
Shaft and hub Shaft observations, hub drawing, mounting reference and available space Shaft designation, geometry and applicable drive requirements Identify the unresolved dimension, fit or engagement requirement
Mounting Pilot and bore, faces, hole positions and types, bellhousing reference Candidate mounting drawing and assembly requirements Compare tolerances, seating and fastening requirements
Each port Function, body connection, adapter, pipe end, seal and orientation Complete port definition and proposed connecting parts Mark hidden or undocumented features as unknown
Assembly Drive, rear pump, supports and installation envelope Load confirmation, layout and proposed changes Identify the required review and approval documents
Release Operating requirements and open-item list Confirmed code and document revisions Record responsible approver, date and scope of approval

Use clear statuses: confirmed against identified evidence, difference requiring approval, or not yet established. An empty field is not a pass. A useful resolution names the exact issue, required document, responsible party and closure record.

For example, if the candidate's flange matches the retained bellhousing drawing but the coupling-hub drawing is missing, record the mounting comparison as confirmed within its scope and the shaft engagement as not yet established. Do not carry the mounting result across to the unresolved shaft connection. This is an illustrative documentation example, not a reported customer project.

Close interface items before releasing that part of the specification. Final installation approval must also address the operating requirements, including circuit, rotation, displacement, pressure, speed, controls, fluid and applicable drain or inlet conditions. An interface review has a defined scope within that larger decision.

For excavator replacements, the hydraulic pump matching guide for excavators covers the broader machine-level checks for flow, pressure and model identification.

Request Confirmation of the Proposed Pump Configuration

Sheungchak's hydraulic piston pump configurations provide a starting point for a replacement or OEM enquiry. The relevant supply options must be confirmed for the proposed complete code and installation.

Send the comparison record with the nameplate and installed-view photographs, pump and mating-component drawings, operating requirements and quantity. Identify the components that must remain in service. Request the proposed supply code, applicable interface drawing and a written response addressing differences and missing information.

For a project with interface differences, request a pump configuration review from Sheungchak. Submit the available evidence and ask which configuration can be proposed for evaluation. Any changes and final installation suitability need confirmation by the responsible technical parties.