To prepare custom hydraulic pump specifications, provide the operating points and duty cycle, available drive power and torque, mechanical interfaces, control requirements, fluid and installation conditions, and acceptance criteria. Attach the drawings and records that define those requirements, and mark anything that still needs a supplier proposal.
A useful request for quotation (RFQ) connects each requirement to its operating conditions and approval status. A maximum pressure, a displacement and a photograph cannot define the complete requirement. The checklist below is intended for OEM buyers sourcing a rotating-shaft hydraulic pump; a complete power unit also needs a separately defined system scope.

Define the Pump and the Scope of Supply
Start with the machine's task and what the supplier is expected to deliver. State whether the request covers the pump alone, a pump with controls and accessories, or a complete assembly including the drive, reservoir and other system components.
If the pump type is still undecided, browse the available hydraulic pump types to identify platforms for discussion. Availability and suitability must be confirmed for the proposed configuration.
Identify whether the hydraulic circuit is open or closed, if known. For replacement work, attach the existing nameplate, model code and available drawings. Describe the required function even when an existing model number is available: retaining a model designation does not resolve a changed duty cycle or drive arrangement.
Existing Platform, Modified Configuration or New Development
Separate the parts of the design that are already approved from those open to a supplier proposal. An approved mounting envelope may be fixed while the control arrangement remains undecided. A proposed shaft change may require an engineering assessment rather than a catalogue option.
Ask the supplier to identify the proposed platform, configuration changes, development work and exclusions. If ownership of the design or validation work is unclear, first define the hydraulic pump manufacturing scope. This keeps a configuration quotation and a development proposal from being treated as equivalent offers.
Provide Operating Points and the Duty Cycle
Specify the conditions that occur together. Separate maximum pressure, maximum flow and maximum speed entries do not tell a supplier whether those values must be achieved simultaneously.
Pressure, Delivered Flow, Speed and Duration
Use a row for each meaningful part of the machine cycle. Include normal operation, sustained high load, short peaks and starting conditions where relevant. The following is a blank input structure, not a prescribed test cycle.
| Operating condition | Required delivered flow | Pressure definition and value | Pump speed | Duration and frequency | Fluid condition and evidence |
|---|---|---|---|---|---|
| Normal working step | L/min, at the stated point | Identify ports, reference and unit | rpm | Time per step; cycles per hour | Oil temperature; measured or estimated |
| Sustained high load | L/min under load | Required pressure or differential | rpm | Continuous period; repetition | Temperature and data source |
| Short peak | Flow needed during the event | Peak value and measurement location | rpm | Peak duration; frequency | Trace or estimate, with limitations |
| Starting or standby | Required behaviour | Relevant pressure condition | rpm or speed ramp | Starting sequence or standby period | Cold or hot condition |
Use one agreed unit system throughout the RFQ and label every value. If source documents use psi, GPM or in³/rev, identify the original units, specify whether gallons are US or Imperial, and provide the agreed conversions rather than mixing unlabelled units.
Record displacement in cm³/rev if it is already specified, and state whether the required pump is fixed or variable displacement. For a variable-displacement pump, identify the specified maximum displacement and any required operating range. Mark the displacement as confirmed, estimated or to be proposed. If it is unknown, provide the required delivered flow and operating speed at each duty point and ask the supplier to propose the displacement and explain its delivery assumptions.
For a pump at a stated displacement, delivered flow can be estimated as Q = Vg × n × ηv ÷ 1000, where Q is delivered flow in L/min, Vg is displacement in cm³/rev, n is shaft speed in rpm, and ηv is volumetric efficiency expressed as a fraction. For a variable-displacement pump, use the displacement at that operating point. Volumetric efficiency depends on the pump and operating conditions; do not insert an assumed universal value. (Danfoss, Series 42, sizing equations, p. 13)
State whether flow means theoretical displacement flow or actual delivered flow at load. Also distinguish pump outlet pressure from pressure differential across the pump, and identify gauge or absolute pressure where relevant.
Pressure terminology needs the same care. Danfoss's September 2025 Series 42 documentation explicitly distinguishes maximum working pressure from continuous operation. That definition belongs to that series; ask the proposed pump supplier to explain its own pressure ratings against your duty cycle. (Danfoss, Series 42 Technical Information)
Available Drive Power and Torque
Provide the prime mover type, speed range, drive ratio and available shaft power and torque over that range. Identify any gearbox or PTO limits and whether the pump shares the drive with another load. A motor nameplate alone may leave the available operating envelope unresolved.
For a basic consistency check, hydraulic output power is:
Hydraulic output power (kW) = pressure differential (bar) × delivered flow (L/min) ÷ 600.
Hypothetical example: delivering 60 L/min across a 200 bar differential represents 20 kW of hydraulic output. Required shaft input is higher once pump losses are included. This does not establish that a 20 kW motor is sufficient. Danfoss's sizing equations distinguish delivered flow, pressure differential, shaft input and overall efficiency; the example uses no assumed efficiency or supplier test result. (Danfoss, Series 42, sizing equations, p. 13)

Ask the supplier to confirm the achievable operating points and any torque or power limiting requirements. For unusual combinations of pressure, flow and speed, review a supplier's pump test capability before agreeing how those points will be verified.
Specify Mechanical Interfaces on a Controlled Drawing
A mounting designation or photograph can help identify an existing arrangement. Use an approved drawing to define what must fit, including units, tolerances, drawing number and revision.
Rotation Viewpoint, Shaft and Mounting
Record rotation together with the viewing direction, such as clockwise when looking at the shaft end. Confirm that the supplier uses the same viewpoint.
Define the shaft form and dimensions, key or spline details, engagement length, mounting pilot, flange and bolt pattern. Identify the coupling and any radial or axial shaft loads. Where another pump mounts behind the unit, include its mass, support arrangement and drive requirements. Danfoss's April 2021 LPV technical documentation treats external shaft loading and mounting flange loading as separate design considerations; its limits apply to the LPV configuration described. (Danfoss, LPV Technical Information, April 2021)
Ports, Orientation and Installation Space
Specify each port's function, connection standard, size and sealing arrangement. Show port orientation and the space needed for fittings, hoses, controls and service access. Include any restriction on overall length or connector removal.
Ask for the proposed interface drawing and a list of differences from the requirement. A reply stating only "compatible" leaves dimensional and functional differences unresolved. Record each proposed deviation and its approval status before releasing the configuration.

Describe Control Functions and Interfaces
Describe what the pump must do before selecting a control code. Requirements may include maintaining pressure, responding to a load-sensing signal, varying displacement with a command, or limiting drive torque or power. A familiar code from another series does not establish the required behaviour.
For each required function, state the setting or adjustable range, command source, expected response and responsibility for adjustment. Identify which components the buyer and supplier each provide, including any pilot supply, controller or sensor.
Where electrical control applies, attach the signal definition, supply requirements, connector and pin assignment, and wiring information. Specify the required behaviour after command loss or loss of electrical power, then ask the supplier to confirm what the proposed control actually does. Treat machine-level safety functions as a separate validation responsibility.

The supplier's response should connect the functional requirement to its proposed control configuration and identify remaining integration work. A control option name alone is insufficient for that review.
Record Fluid, Temperature and Installation Conditions
Provide the fluid's full product identification and available technical data, along with expected cold-start, normal and hottest operating temperatures. Include ambient conditions, contamination exposure and any specified cleanliness target with its basis.
An oil grade alone does not define the operating viscosity. Danfoss's April 2021 LPV technical documentation requires temperature and viscosity limits to be satisfied together and distinguishes cold-start conditions. Use the proposed pump's applicable documentation to establish the limits for your project. (Danfoss, LPV, operating parameters)
Inlet, Charge and Case-Drain Requirements Where Applicable
Match the requested information to the circuit and pump design:
- Open-circuit supply: provide the reservoir and inlet arrangement, line layout, expected inlet conditions and starting conditions for review.
- Closed-circuit installation: include the charge supply arrangement, low-pressure side conditions, cooling or flushing arrangement and relevant auxiliary demands.
- Separate case drain: where the pump requires one, identify the proposed outlet, routing, return connection, restrictions and expected case-pressure conditions.
Mark a field "not applicable" only when the design supports that conclusion. Otherwise mark it unknown and request confirmation. Avoid assigning an independent case-drain connection to every pump or imposing closed-circuit charge requirements on an unrelated design.
If case-drain flow will be an acceptance measurement, agree the pump configuration, control state, operating point and measurement arrangement. Webtec's technical discussion explains that internal leakage paths and added drain-line resistance affect interpretation. It is a measurement-equipment supplier's technical source, not a universal pass/fail specification. (Webtec, Monitoring Hydraulic Pump Case Drains, Steve Skinner)
For procurement acceptance, obtain the applicable pump manufacturer's limits and agree project-specific criteria for the stated configuration and test conditions; do not treat this discussion as a universal case-drain pass/fail specification.

Agree Acceptance Criteria and Required Records
Define how a requirement will be checked and where its acceptance limit comes from. "Tested before shipment" does not specify the test conditions, coverage or records included in an offer.
ISO 4409:2019 addresses steady-state performance testing and result presentation for positive-displacement hydraulic components with rotating shafts. Citing it does not establish project-specific pass/fail values or demonstrate transient, endurance or whole-machine validation. The public abstract supports this scope statement; the paid standard text has not been used here. (ISO 4409:2019)
Prototype Validation versus Production Acceptance
Separate tests intended to validate a proposed design from checks required on supplied production units. Specify whether a requirement applies to every unit, a sample or a separate prototype programme. Include whole-machine validation responsibilities where component tests cannot establish the final result.
| Requirement | Method and conditions to agree | Acceptance basis | Required record and responsibility |
|---|---|---|---|
| Delivered flow at load | Pressure definition, speed, fluid, temperature and measurement basis | Approved specification revision | Unit or sample identity; results; approval owner |
| Control function | Command, load condition, settings and response measurement | Agreed functional criteria | Configuration and settings; responsible party |
| External leakage or case-drain behaviour | Applicable circuit, operating point and measurement arrangement | Product-specific, agreed limit | Test conditions and result; scope exclusions |
| Interface conformity | Inspection against the approved drawing | Drawing revision and tolerances | Inspection record; deviation approval |
| Endurance or machine performance, if required | Separate procedure, duration and system conditions | Project validation plan | Report, exclusions and release authority |

Ask the supplier to identify which checks are included, which require separate agreement and which remain with the machine builder. Then define pre-shipment pump acceptance records around that agreed scope.
Complete the RFQ Checklist and Flag Unknowns
Bring the requirements into one controlled package. The following custom hydraulic pump specifications checklist is a suggested procurement tool, not an ISO form or a claim about any supplier's internal procedure.
| Field group | Buyer input and attachment | Supplier response requested |
|---|---|---|
| Project and scope | Machine task; pump or assembly; new design, modification or replacement; circuit diagram | Proposed platform, supply boundary and exclusions |
| Operating points | Delivered flow, pressure definition, speed, duration and frequency; measured or estimated evidence | Achievable points, conditions and deviations |
| Displacement | cm³/rev if specified; fixed or variable; maximum displacement and required range where relevant; confirmed, estimated or to be proposed | Proposed displacement, delivery assumptions and fit with the required flow and speed |
| Drive | Available shaft power and torque over the speed range; coupling, drive ratio and shared loads | Drive compatibility and limiting requirements |
| Mechanical interfaces | Rotation viewpoint; shaft, mounting, ports, orientation and installation drawing | Proposed drawing and differences from the requirement |
| Controls | Required behaviour, settings, signals and component responsibilities | Control configuration and integration work |
| Fluid and environment | Fluid identification, temperatures, cleanliness basis and applicable inlet, charge and drain details | Compatibility, operating limits and missing inputs |
| Quality and validation | Test points, methods, limit sources, inspection coverage and report requirements | Included tests, exclusions and approval responsibilities |
| Commercial and delivery | Prototype and production quantities, forecast demand, target dates, packaging and documents | Project-specific MOQ, charges, schedule and warranty terms |
Separate Confirmed Requirements from Supplier Proposals
Assign each entry a status: confirmed, estimated, to be proposed, or not applicable. Keep its information source, document revision, owner and unresolved issue alongside it.
For example, a measured machine speed can be confirmed while peak duration remains estimated and the control configuration is to be proposed. Ask the supplier to state the assumptions used in its quotation. Estimated inputs and unresolved proposals should remain visible until the relevant owner approves them.
Send the checklist with the duty-cycle record, circuit diagram, controlled interface drawings, existing identification where relevant, and acceptance requirements. Compare quotations against this same revision, including deviations and exclusions. Separate target dates and forecast quantities from terms the supplier has actually accepted.
To request a configuration and feasibility assessment, submit a pump specification for OEM/ODM review. Include the open questions as well as confirmed requirements, and request a response identifying the proposed configuration, exceptions and information still needed. Availability, development work, testing and commercial terms remain subject to project-specific confirmation.